One of the first industrial energy arbitrage solutions (load-shifting) for a Solar BR beverage factory (Coca-Cola Group) located in São Luis, Maranhão using NEC/LG batteries.

The system has been operating since 2018, delivering savings and resilience (through fast backup) to the industrial plant, meeting the standards of efficiency and continuous improvement advocated by the group.

Deixe um comentário

O seu endereço de e-mail não será publicado. Campos obrigatórios são marcados com *