Largest Shopping Center project in operation since 2019, with 1.5MWh of capacity, using Tesla batteries (Powerpacks).

780kW system – 1,560 kWh

Delivery of approximately 20% savings at peak hours using peak-time tariff arbitration (load-shifting) for this customer who is connected to Coelba on the A4 Verde. Improved power quality through the backup function, making network fluctuations imperceptible to the mall’s load.