Largest Shopping Center project in operation since 2019, with 1.5MWh of capacity, using Tesla batteries (Powerpacks).
780kW system – 1,560 kWh
Delivery of approximately 20% savings at peak hours using peak-time tariff arbitration (load-shifting) for this customer who is connected to Coelba on the A4 Verde. Improved power quality through the backup function, making network fluctuations imperceptible to the mall’s load.

Did you like this Solution?
We are specialists in reducing your costs and also your Carbon footprint, so don't waste time, click here now and let's talk!