Skip to content
Micropower EnergyMicropower Energy
  • HOME
  • CASES
  • ABOUT
  • SOLUTIONS
  • BLOG
  • CONTACT
  • PT
  • EN
  • get in touch

BLOG

Cases

Distribution Company

Posted on novembro 10, 2022novembro 23, 2022 by admin
10
nov

The largest 100% fully renewable isolated microgrid in Brazil, implemented by Micropower in the interior of Bahia, serving a community without access to Coelba’s distribution network.

Continuar lendo →
Postado em Cases  |  Marcado (EaaS),brazil,distribution-company,energy generation,Energy storage,Energy-as-a-Service (EaaS),microgrid,storage technology Deixe um comentário
Cases

Multinational Mine

Posted on novembro 10, 2022novembro 23, 2022 by admin
10
nov

Micropower’s largest energy storage project, with 10 MWh of Tesla batteries (Megapacks) installed in a port of a multinational mining company in Mangaratiba, Rio de Janeiro.

Continuar lendo →
Postado em Cases  |  Marcado energy generation,Energy storage,Energy-as-a-Service (EaaS),Multinational Mine Deixe um comentário
Cases

Shopping Avenida

Posted on novembro 10, 2022novembro 23, 2022 by admin
10
nov

Largest Shopping Center project in operation since 2019, with 1.5MWh of capacity, using Tesla batteries (Powerpacks).

Continuar lendo →
Postado em Cases Deixe um comentário
Cases

Solar BR / Coca-Cola

Posted on novembro 2, 2022novembro 23, 2022 by admin
02
nov

One of the first industrial energy arbitrage solutions (load-shifting) for a Solar BR beverage factory (Coca-Cola Group) located in São Luis, Maranhão using NEC/LG batteries.

Continuar lendo →
Postado em Cases Deixe um comentário
Cases

McDonald’s

Posted on novembro 2, 2022novembro 23, 2022 by admin
02
nov

Micropower’s first commercial application project in operation since 2018, with this store located on Rua Henrique Schaumann, in the Cerqueira Cesar region of São Paulo, using NEC/LG batteries.

Continuar lendo →
Postado em Cases Deixe um comentário
Cases

Doc 88

Posted on novembro 1, 2022novembro 23, 2022 by admin
01
nov

Battery project in the office of a technology company from the Comerc Group, located in Vila Nova Conceição in São Paulo, near the Faria Lima region, using NEC/LG batteries.

Continuar lendo →
Postado em Cases 1 Comentário

Micropower is a leading developer of energy storage projects, as well as solar generation and microgrids, that help our customers reduce their energy costs while meeting their environmental goals.

It's time to reduce your costs and your carbon footprint

We are experts on the subject, let's talk

SEE OUR CASES

Multinational Mine

Micropower's largest energy storage project, with 10 MWh of Tesla batteries (Megapacks) installed in a [...]

10
nov
Shopping Avenida

Largest Shopping Center project in operation since 2019, with 1.5MWh of capacity, using Tesla batteries [...]

10
nov
Doc 88

Battery project in the office of a technology company from the Comerc Group, located in [...]

1 Comment

01
nov
Solar BR / Coca-Cola

One of the first industrial energy arbitrage solutions (load-shifting) for a Solar BR beverage factory [...]

02
nov
Distribution Company

The largest 100% fully renewable isolated microgrid in Brazil, implemented by Micropower in the interior [...]

10
nov
McDonald’s

Micropower's first commercial application project in operation since 2018, with this store located on Rua [...]

02
nov

In the media

ABOUT US

who we are

CONTACT US

SAC: (11) 3039-3923

(Monday to Friday 8 am to 5 pm)

Follow us:
COMPLIANCE AND GDPL

Privacy Policy

Code of ethics and conduct

Website Terms and Conditions of Use

  • HOME
  • CASES
  • ABOUT
  • SOLUTIONS
  • BLOG
  • CONTACT
  • -
  • Newsletter