Micropower’s largest energy storage project, with 10 MWh of Tesla batteries (Megapacks) installed in a port of a multinational mining company in Mangaratiba, Rio de Janeiro.

5,000kW – 10,100 kWh system

The system connected “behind the meter” has the function of reducing the high contracted demand in peak and off-peak hours (peak shaving) through the load compensation of the customer, currently connected in A3 at ENEL RJ, contributing with a reduction of up to 20 % in peak hour charge costs while relieving local demand on the distribution system.

Among the main features of the project, the high availability and resilience of the system stands out, which has autonomous management and a local and remote monitoring interface.