The largest 100% fully renewable isolated microgrid in Brazil, implemented by Micropower in the interior of Bahia, serving a community without access to Coelba’s distribution network.
Arquivos de Autor: admin
Micropower’s largest energy storage project, with 10 MWh of Tesla batteries (Megapacks) installed in a port of a multinational mining company in Mangaratiba, Rio de Janeiro.
Largest Shopping Center project in operation since 2019, with 1.5MWh of capacity, using Tesla batteries (Powerpacks).
One of the first industrial energy arbitrage solutions (load-shifting) for a Solar BR beverage factory (Coca-Cola Group) located in São Luis, Maranhão using NEC/LG batteries.
Micropower’s first commercial application project in operation since 2018, with this store located on Rua Henrique Schaumann, in the Cerqueira Cesar region of São Paulo, using NEC/LG batteries.
Battery project in the office of a technology company from the Comerc Group, located in Vila Nova Conceição in São Paulo, near the Faria Lima region, using NEC/LG batteries.